Integrated Parametric Model

 

The Integration of the Individual Projects was made possible by establishing connection Points between the Different Individual Project in order to realize the Integrated Project as a whole Unit which would allow it to perform the required Function.

The Integration of the Individual Components helps to achieve a solution that is more Eco-friendly and more Reliable in the long run than Projects which depend on traditional Designs.

 

The First Connection Point is made between the Pavement and the Arched Bridge in order to provide Access to the Harbor

cp1

 

 

The Second Connection Point is between the Arched Bridge and the Harbor Facility which offers access to more Areas within the Harbor itself.


cp2

 

 

The Third and Last connection Point is between the Different Harbor Facilities using the Steel Bridge integrated with Break water which forms a protective Boundary around the Whole Project as protection from the Environmental Factors.

 

cp3

 

 

Here you can Download the Full Integrated Model: Integrated Parametric Model

 

integration-overview