Group2

Introduction

The aim of this assignment was to integrate three individual civil system, library, opera-house and a roller coaster into one system. The purpose of the integration was to determine, how the three individual system (sub-systems) would interact together and work as a one system. Putting different sub-systems, which have different functionalities into one functional system, was challenging. In order to have a system that is fully integrated and can deliver a specific value, the functionalities of each system had to be examined in detail with the intention of having a final functional system. After going through all of these steps the final integrated system “Culture Park” was created.

introdcution

The three individual systems:

1) Academic library

2) Rollercoaster

3) Opera-house

The integrated system:

1) Ontology

2) Model