collage4

Group 1

Members of Group 1:


 

 Task:

  1. Understand the relations between different components over their life cycle.
  2. Integrate the life cycle models.
  3. Analyze different integrated maintenance strategies.
  4. Show how changes in one product’s maintenance planning affects the other systems.
  5. Analyze different integrated maintenance strategies in regards to the life-cycle cost.
  6. Find the optimum with optimization and multi-criteria assessment methods introduced in the lectures.

Systems:

 

Energy:

1. Nuclear Power Plant 

2. Off Shore Wind Farm


Infrastructure:

1. Railway Power Supply 

2. Steel Railway Tuss Bridge

3. Railway Lift Bridge

collage4