Development of integration context

In these engineering challange the Integration Context is represented below through a pedestiranian Walkway between two objects.

screenshot-2021-02-24-194615

source; king-liberty-bridge, www.toronto.ca

The integration context of the project is conducted on elements utilized in the structure to enclose part of the walkway. The structure should consider the shell with its primary bearing elements. Since the last manner is characterized as an integrated item, it has to be functioning as a bearing structure as well as a technical organism. Due to environmental considerations the life cycle analysis of the project is conducted on Elements utilizing resource conservative materials, especially decision on these rational bases have to consider the life cycle of various products with the cost’s strategies, since the usage of these products have risks regarded to weather exposure and other limitations related to fire safety. Together with a water sprinkler system and thermal insulation composite system components an internal escape system for fire safety have to be considered by integrating a walkway with fire resistance elevators. Therefore the system boundary have to be designed as a permanent feature which insure the flow of different information between the sub-systems through the physical interfaces and in a logical decomposition.

For more Information on how the subsystems interact with each other within the main domain, a theoretical concept of Interfaces between civil systems is presented.


Navigation

Home 

Integration context